SUPCON SOLAR Delingha 50MW CSP Plant released the latest operation data
Updated:2021-11-04 | Source:Cosin Solar
The total power generation of the plant was 14.571GWh in September, with achieving rate of 99.98%, and the following October, the monthly power generation of the plant was 13.671GWh, with achieving rate of 102.25%.